Integration of New Cooling Towers Improves Milk Production Efficiency

A leading American dairy producer was facing challenges with their milk production process that hampered them from scaling to meet increased demand. E Tech Group facilitated a control system upgrade that included the integration of 2 new cooling towers.

The Project: Support Increased Efficiency for a Leading Milk Producer

A leading American dairy producer faced efficiency and scalability challenges with their milk production process. They recognized the need for additional cooling towers, as they were having trouble scaling to meet increased demand with their current cooling towers. 

The company sought an automation system integrator that understood the careful precision beverage control system design and implementation requires. They engaged E Tech Group for this project, as we were the system integrator that developed their existing system. They knew our automation team had the integration expertise to successfully deploy this project on-time and within budget.

The Solution: End-to-End Project Support by Expert Automation Engineers

The project required comprehensive control engineering support. This included control system design and development, input/output validation, system functionality testing, and custom control panel design and fabrication based on the customer’s requirements.

PLC, HMI, and SCADA programing were also needed to control and monitor the new equipment as well as balance the water flow between the client’s cooling towers. E Tech Group engaged the engineering team to create the best controls strategy: 

  • First, the project team verified the project scope with the client and collaborated on proactive solutions to potential installation and integration challenges.
  • Next, the project team developed the control system design including Rockwell Automation CompactLogix PLCs and PanelView Plus HMI, and Inductive Automation Ignition SCADA programing.
  • New IFM I/O Link modules, PowerFlex drives and Soft Starters were also integrated to monitor new instruments and control new motors for pumps and fans added to the automation system.

The project team integrated these components with the client’s custom UL 508A control panel build, keeping safety, functionality, and durability of the design top-of-mind.  

Results

The control system panel construction was executed in eight weeks and site commissioning was completed in three days, including a few days planned for fine tuning. The integration and installation of additional cooling towers helped increase the client’s milk processing capacity, supporting greater production efficiency and quality control. By investing in modern technology and upgrading their automation infrastructure, the plant was able to meet the growing and quality demand for their milk products, supporting the company’s competitive edge in the market.